KL Gold - Macassa Mine
2003 - 2008
-Mechanized development
-Track drift development
-Alimak raising
-Stoping, Drift rehabilitation
-Underground construction - chutes
|
Newmont - Holt McDermott Mine
2005-2006
-Mechanized lateral development
-Track development drifting
|
KL Gold - Lakeshore Ramp
2003 - 2004
-Reopening, rehabilitation and commissioning the Lake Shore ramp
-Open Raising
-Mechanized Development
|
Newmont - Holloway Mine
2004 - 2006
-Mechanized lateral and ramp development
|
First Nickel - Lockerby Mine
2005
-Performed the reopening and commissioning of the former Falconbridge
operated mine
|
Debeers - Victor Project
2001 Season
-Initial 10,000 ton bulk sample at proposed diamond mine in remote area 90
km west of Attawapiskat
-Expedite the transport of equipment
|
Barrick - Holt McDermott
1998 - 2004
-Deepening of production shaft
-Alimak raising
-Lateral and ramp development
-Underground construction - cranes, shops
|
Debeers - Victor Project
2002 Season
-Surface drilling and blasting and placement of materials to determine
foundation requirements for future operating plants
|
Foran Mining - North Star
2003 - 2004
-Complete surface facilities and services supply
-Establish portal
-Excavate ramp to mining horizon and sill out zones
|
Potash Corp. - Cory Mine
2004
-Modifications and additiona; anchorage of main production shaft
|
Inco - T1 Mine
2003
-Excavation and construction of the 2802 service bay and lube room
|
Gartner Lee
Gowganda Area Mine Rehab
2005 Season
-Remediation to MNDM specifications of abandoned mine workings that included
the design and installation of 15 shaft caps
|
Inco - T3 Mine
2004 - Present
-Mechanized lateral development of the 3500L north exploration drift
-Conventional development to provide access on 4 levels for the 319 shaft pillar
recovery
|
Inco - Birchtree Mine
2003 - 2006
-Mechanized lateral and ramp development
-Alimak and conventional raising
-Provide construction, mechanical and electrical services as required
|
Inco - 1D Lower Project
2005 - Present
-Mechanized lateral and ramp development
-Alimak and conventional raising
-Excavation of the main garage facility
-Installation of leaky feeder system
-Rehabilitation of 10,000 ft. of track drift to facilitate diamond drilling
-Provide construction, mechanical and electrical services as required
-Replace shaft brattice to maintain manway integrity
|
Inco - Birchtree Mine
2000 - Present
-Mine deepening project including pentice removal and shaft installations to
allow skipping from the 4000L
-Mechanized lateral and ramp development
-Alimak and conventional raising
-Complete load out facilities construction including mechanical and electrical
-Excavation and construction of a 15,000 sq.ft. shop complex complete with 3
overhead cranes and a mechanized wash bay
-Installation of cemented backfill system consisting of shaft slick line, silos,
compressors, HDP distribution piping and flash mixers
|