About Us | Site Map | Contact Us | Home

Completed Projects
  • KL Gold - Macassa Mine
    2003 - 2006
    -Mechanized development
    -Track drift development
    -Alimak raising
    -Stoping,  Drift rehabilitation
    -Underground construction - chutes


  • KL Gold - Lakeshore Ramp
    2003 - 2004
    -Reopening, rehabilitation and commissioning the Lake Shore ramp
    -Open Raising
    -Mechanized Development


  • First Nickel - Lockerby Mine
    2005
    -Performed the reopening and commissioning of the former Falconbridge operated mine


  • Barrick - Holt McDermott
    1998 - 2004
    -Deepening of production shaft
    -Alimak raising
    -Lateral and ramp development
    -Underground construction - cranes, shops

  • Foran Mining - North Star
    2003 - 2004
    -Complete surface facilities and services supply
    -Establish portal
    -Excavate ramp to mining horizon and sill out zones

  • Inco - T1 Mine
    2003
    -Excavation and construction of the 2802 service bay and lube room

  • Inco - T3 Mine
    2004 - 2005
    -Mechanized lateral development of the 3500L north exploration drift
    -Conventional development to provide access on 4 levels for the 319 shaft pillar recovery

  • Inco - 1D Lower Project
    2005 -
    -Mechanized lateral and ramp development
    -Alimak and conventional raising
    -Excavation of the main garage facility
    -Installation of leaky feeder system
    -Rehabilitation of 10,000 ft. of track drift to facilitate diamond drilling
    -Provide construction, mechanical and electrical services as required
    -Replace shaft brattice to maintain manway integrity






  • Newmont - Holt McDermott Mine
    2005-2006
    -Mechanized lateral development
    -Track development drifting


  • Newmont - Holloway Mine
    2004 - 2006
    -Mechanized lateral and ramp development


  • Debeers - Victor Project
    2001 Season
    -Initial 10,000 ton bulk sample at proposed diamond mine in remote area 90 km west of Attawapiskat
    -Expedite the transport of equipment


  • Debeers - Victor Project
    2002 Season
    -Surface drilling and blasting and placement of materials to determine foundation requirements for future operating plants


  • Potash Corp. - Cory Mine
    2004
    -Modifications and additiona; anchorage of main production shaft


  • Gartner Lee
    Gowganda Area Mine Rehab

    2005 Season
    -Remediation to MNDM specifications of abandoned mine workings that included the design and installation of 15 shaft caps


  • Inco - Birchtree Mine
    2003 - 2006
    -Mechanized lateral and ramp development
    -Alimak and conventional raising
    -Provide construction, mechanical and electrical services as required


  • Inco - Birchtree Mine
    2000 - 2003
    -Mine deepening project including pentice removal and shaft installations to allow skipping from the 4000L
    -Mechanized lateral and ramp development
    -Alimak and conventional raising
    -Complete load out facilities construction including mechanical and electrical
    -Excavation and construction of a 15,000 sq.ft. shop complex complete with 3 overhead cranes and a mechanized wash bay
    -Installation of cemented backfill system consisting of shaft slick line, silos, compressors, HDP distribution piping and flash mixers





Copyright © 2006  Alex MacIntyre & Associates Ltd.
* All rights reserved   -   Terms of Use
created by danp